Sterling delivered the construction of a new concrete bridge deck to the Wood St Railway Bridge on the Pakenham Rail Line in Beaconsfield. Victoria for Metro Trains Melbourne.
Metro Trains Melbourne required renewal of the deteriorating timber bridge deck on Wood St Bridge. The existing structure had reached end-of-life and needed replacement with a modern precast solution while maintaining traffic flow.
Sterling provided a full construction service to plan and replace the timber structure with precast concrete panels.
Renewal of the bridge deck, ballast, sleepers and track during a planned rail occupation. Works delivered on time and to budget.
Successfully delivered a modern bridge structure replacing the deteriorated timber components, improving load capacity and extending the asset's service life by decades.


Next Project
Sterling designed culvert renewals on V/Line's Eaglehawk Line during planned track closure, delivering drainage upgrades and track reconstruction within tight timeframes.
Let's discuss how we can help deliver your infrastructure needs
Contact Us