Sterling delivered complete bridge deck renewal for Wood St Bridge including structural inspections, design documentation, and construction supervision for Main Roads Victoria.
Main Roads Victoria required renewal of the deteriorating timber bridge deck on Wood St Bridge. The existing structure had reached end-of-life and needed replacement with a modern precast solution while maintaining traffic flow.
Sterling provided complete design documentation and construction supervision for replacing the timber structure with precast concrete panels. Our engineers coordinated with contractors to ensure the new system met all structural and safety requirements.
Structural design documentation, construction supervision services, quality assurance inspections during installation, and as-built documentation for Main Roads Victoria's asset management system.
Successfully delivered a modern bridge structure replacing the deteriorated timber components, improving load capacity and extending the asset's service life by decades.


Next Project
Sterling managed complete culvert replacement on V/Line's Eaglehawk Line during planned track closure, delivering drainage upgrades and track reconstruction within tight timeframes.
Let's discuss how we can help deliver your infrastructure needs
Contact Us