Sterling Infrastructure
Home/Projects/Little Road Bridge Strategic Asset Management Assessment
PROJECT OVERVIEW

Little Road Bridge Strategic Asset Management Assessment

Little Road Bridge is a 34-metre, three-span bridge comprising steel girders, timber crossbeams and timber plank decking supported on timber pile piers. Sterling assessed seven long-term strategies to guide safe pedestrian access and heritage asset management.

Little Road Bridge Strategic Asset Management Assessment

Challenge

The former road bridge had been retained for pedestrians and cyclists but required a new management strategy before access could be restored. The assessment needed to balance public safety, heritage value, structural condition and the whole-of-life implications of repair, rehabilitation or replacement.

Solution

Sterling prepared a Present Value End of Life (PVEoL) assessment using existing inspection, engineering assessment and load-rating information. The assessment compared seven strategies: continued closure, targeted pedestrian reopening, strengthening, major rehabilitation, a parallel pedestrian bridge and full replacement. It evaluated loading, safety, heritage, risk and service life while incorporating stakeholder feedback on access, timber condition and replacement options.

Deliverables

Deliverables included a strategic options assessment and summary comparing seven intervention pathways, a whole-of-life evaluation of the existing bridge, concept-level scopes for repair, strengthening, rehabilitation and replacement and a preferred strategy supported by loading, risk, heritage and service-life considerations.

Outcome

The assessment identified a three-metre-wide central pedestrian path as the preferred strategy, supported by selected repairs, new surfacing, handrails and protective fencing. This gave the asset owner a pathway to reopen the bridge for pedestrians, preserve its heritage character and defer major rehabilitation or replacement. The strategy included ongoing inspection and maintenance across an indicative 30-year management horizon.

Explore More Projects

View our full portfolio of infrastructure projects across Australia

View All Projects

Ready to Start Your Project?

Let's discuss how we can help deliver your infrastructure needs

Contact Us