ARTC required routine visual and engineering asset inspection and load rating across 19,000 assets spanning multiple Australian states from Kalgoorlie (WA) to Acacia Ridge (Qld), all branch lines, and everything in between.

ARTC asset managers require ongoing asset condition data across all their structural assets so that they can prioritise maintenance interventions and maintain compliance.
Sterling provided a complete project delivery solution to ensure all assets were inspected, condition rated and where required load rated. The Sterling project team consisted of structural inspectors, engineers, data analysts, rail safety and traffic management operatives and specialist project management and coordinators. Works were completed in some of the most remote areas of Australia.
Asset inspection and condition reports delivered per asset, data deliverables delivered directly into the ARTC asset management system, engineering reports for each bridge structure, documenting structural condition, and load rating for as is condition.
Provided ARTC with detailed technical understanding of asset condition and practical remediation strategies, enabling informed investment decisions for infrastructure preservation.
View our full portfolio of infrastructure projects across Australia
View All ProjectsLet's discuss how we can help deliver your infrastructure needs
Contact Us